Home Page NVS RO NVS HQ C.B.S.E NCERT RTE facebook tweeter google linked in you tube


Thought of the Day : इससे पहले कि सपने सच हों आपको सपने देखने होंगे . BY: - ABDUL KALAM

Infrastructure

Infrastructure Position

I

Area of land  allotted (in acres)

Whether land transferred in the Name of Samiti

Vidyalaya shifted to permanent buildings on

: 30 ACRES

: YES

: YES

ii

Status of Boundary Wall

a.  Brick Wall

b.  Barbed wire fencing

: (Completed)

BELL A STONE WALL

iii

Permanent buildings constructed

: (CBRI pattern/ CPWD pattern)

CBRI & CPWD PATTERN

iv

School building

: Complete

v

Dormitories

:  Boys ______________ Nos.

with Warden Residence______ Nos.

:  Girls ______________ Nos.

with Warden Residence______ Nos.

vi

Kitchen/dining Hall

No. of shifts required for all students  to take food

:  Complete / not complete, Area ______

01

vii

Principal Residence

: 01 No.

viii

Staff Quarters

: Type III =  12  Nos.

Type II =   12  Nos.

Type  I  =   12  Nos.

SP Sheds converted into Staff Qrs.:_____ Nos.

ix

M.P. Hall

: Available

x

Workshop

: Available

xi

Type of O.H. Tank

Its capacity

Present Status

: Shaft type / Column based

: 1300000 liters

: Working satisfactory

xii

U.G. tank

Its capacity

Present Status

: 1300000 liters

: Working satisfactory

xiii

D.G. Set

:  Available

: _____________ make

:   75  KV

: Working

: Year of procurement 10.11.2010

xiv

Sewage Pump

: 3 H.P.

xv

Water Pump

: 10 HP capacity

: 7.5 HP capacity

xvi

Electrification

Electric connection

Sub Station building

Street lighting

Numbers of hrs. during day when power supply is available on an average.

:  Urban Feeder

:  Complete

: 51  Nos. of Poles

: 24  hrs.

xvii

Playfields

400 metre track

40 x 30 metre basket ball court

40 x 30 metre volley ball court

: Not available

:  _______Nos.   – Not available

:   10 Nos.   – Available

xviii

Water supply

Tube Well

Hand pump

Connection from PHED

: Potable,  ______ Nos.-  working / not working

: Potable, ______ Nos.-  working / not working

:  3 hours supply in a day

xix

Rajiv Gandhi Smriti Van

:  Available

xx

Fire fighting arrangement

:  Working

xxi

Last date of cleaning of

(a) Septic tank

(b) Water tanks

:

:

xxii

Whether area around transformer is fenced

:  Yes

xxiii

Whether open wells, if any, are covered from top

:   Yes